Flcikerpower banner

  • Home
  • About
    • About the Authors
    • Abbreviations
    • Contact Us
  • Briefing Notes
  • Search
    • By Category
    • By Tag
  • Links
  • You are here:  
  • Home
  • Search
  • By Category
  • General
  • An Open Letter Concerning AEMO’s 2022 Integrated System Plan

An Open Letter Concerning AEMO’s 2022 Integrated System Plan

Correspondence with AEMO on the Integrated System Plan.

  • Letter_Reliability_Assessment_of_the_AEMO_2022_ISP_22_August_2022.pdf
  • pdf20220913_AEMO_Letter_to_Dr_James_Taylor_final.pdf
  • pdfLetter_Response_to_AEMO_ISP_Reliability_IES_3Oct2022.pdf
  • AEMOs_Renewables_Plan_Just_Cant_Cut_It_Nov_2022.pdf
  • A_Reliability_Assessment_of_the_AEMO_2022_Integrated_System_Plan_29_Nov_2022.pdf
  • The_Cost_of_Battery_Firming__AEMOs_2030_Plan_and_Beyond.pdf

Recent Posts

  • 22.6 Is This the Energy Crisis We Had to Have?
  • 22.5 A Warning to all Politicians Obsessed with Net Zero
  • 22.4 The Geopolitics of Energy
  • 22.8 The Snowy2.0 Pumped Hydro Scheme
  • 22.3 The Cost Of Firming Intermittent Wind & Solar Power

On Sale Now

"The main thrust of this book is on target. There is no. climate emergency and policies to address this non-existent threat are harmful to most of the world's people. " Will Happer

Available in print and eBook.

Copyright © 2021 Flickerpower | All rights reserved
Website by agenda